PMG – Būvprojektu vadības grupa
  • Construction
    • Industrial buildings and warehouses
    • Agricultural buildings and barns
    • Boiler houses and biomass plants
    • Public and residential buildings
    • Restoration projects
    • Land reclamation
  • Design
    • Industrial buildings and warehouses
    • Agricultural buildings and barns
    • Boiler houses and biomass plants
    • Public and residential buildings
  • Construction supervision
    • Industrial buildings and engineering structures
    • Public and residential buildings
    • Roads
  • About us
  • Contacts
  • LV
  • EN
  • RU
  • Menu Menu

Reconstruction of the intersection of Bebru and Gaujas streets and the construction of a parking lot in Mārupe

Construction of access roads and fields in the GETLIŅI municipal waste landfill

Construction of the rapid exit taxiway Y and renewal of pavement on runway and taxiway A, RĪGA airport

Reconstruction of the public rainwater sewerage system and the reconstruction of Muzeja street, RĪGA airport

Connection of Kronospan Riga and Latvijas Finieris to the 110 kV substation Bolderāja 2, third stage of construction

Reconstruction of the 330 kV substation’s switchgear at Riga HPP

Kurzeme Arc, third stage of construction of the electricity transmission network, 330 kV

Construction of a biodegradable waste recycling facility at the GETLIŅI landfill

RĪGA airport, 5th terminal

RĪGA airport, 5th terminal

Connection of Kronospan Riga and Latvijas Finieris to the 110 kV substation Bolderāja 2, second stage of construction

Page 2 of 512345
  • Construction
  • Design
  • Construction supervision
  • About us
  • Contacts
  • LV
  • EN
  • RU
  • Facebook
© Copyright - PMG – Būvprojektu vadības grupa
Scroll to top Scroll to top Scroll to top