Reconstruction of the 330 kV substation’s switchgear at Riga HPP

Client: AS ‘’Augstsprieguma tīkls’’

Address: Rīgas HES, Salaspils pagasts, Salaspils novads

P.M.G.’s role: Construction supervision

Construction output: reconstruction of the 330 kV switchgear

Construction cost: 670 000 EUR

Execution time: 04.2019.–11.2020.

CONSTRUCTION SUPERVISION | Industrial buildings and engineering structures